The design and construction drawings for one synthetic turf field and one natural turf field are now complete and Absher Construction has prepared a firm bid for hard costs.  The synthetic turf field will be fenced, with a black wrought iron fence along the street and a chain link fence around the remainder of the field. The natural turf field will have a simple irrigation system and will be located in the vicinity of the planned site for the second synthetic field that can eventually become a stadium.

Field1

Tree removal will begin this winter and field construction will begin in the spring. The hammer throw is in the footprint of the synthetic turf field, so it will be relocated so it is available for the spring track season. The goal is to have both fields ready for use in Fall 2012.